8" Crude Oil Pipeline
PROJECT
Sidi El Kilani Oil Pipeline (126 Km of 8" pipeline)
Client
ASTRAL OIL
Location
TUNISIA
SCHEDULE
1998-1999
SCOPE OF WORK
- Engineering.
- Supply of all equipment (pipe, Shipping and booster pumps, etc.)
- Construction of 126 Km of 8" pipeline and related facilities
- Construction of 3 concentric facilities including pumping metric unit and control.
- Cathodic protection.
